infodesk@techmepi.com +254 723 509 854 Buruburu Business Complex, 2nd Floor Room 22, Nairobi, Kenya
Mon–Fri 8:00–17:00

Sample Sheets

Specimen drawings you can open and zoom

19 illustrative TechMEPi sheets across 9 disciplines, drawn exactly the way we issue them: title block, revision history, legend, general notes and calculated sizes. These are specimens, not project drawings — every sheet is drawn on a neutral reference building, watermarked and marked sample / not for construction.

You are here

Sample drawings

Specimen sheets on a neutral reference building. Published, watermarked, and safe to share — they show the standard of output without exposing anyone’s scheme.

Your project

Our project drawings

The real deliverable: a numbered, revision-controlled and signed drawing set issued to you in stages. Client drawings stay confidential and are never published here.

See the drawing register & issue stages

Filter the Samples

9 disciplines. 19 specimen sheets.

Filter by discipline or by the kind of drawing, then open any sheet full-screen to read the title block, the general notes and the calculated sizes. Judge the standard of output here — then see the register we would issue on your project.

Discipline
Sheet type

Showing all 19 sheets

Water & Plumbing

Cold and hot water distribution, storage, boosting and treatment — sized by calculation, not by rule of thumb.

3 sheets
Water & Plumbing

Cold & Hot Water Layout

Ground floor · pipework, risers and fixture distribution

Cold and hot water distribution set out room by room — mains entry, isolating valves, a zoned riser, a 300 L cylinder and a pumped hot-water return. Pipe sizes are calculated by the loading-unit method, not assumed.

BS EN 806 Loading-unit sizing Velocity ≤ 2.0 m/s
DWG TMEP-PH-DWG-101 REV P2 SCALE 1:50 @ A3
Water & Plumbing

Water Storage, Booster & Riser Schematic

Break tank · transfer pumps · three-zone down service

The sheet that answers "will there be water on the top floor and will it burst a tap on the ground floor". A 45 m³ break tank, duty/standby transfer pumps, roof storage and three pressure zones with reducing valves so no outlet exceeds 3.5 bar.

BS EN 806 24-hour storage rule Max 3.5 bar at any outlet
DWG TMEP-PH-DWG-102 REV P2 SCALE NTS @ A3
Water & Plumbing

RO Water Treatment — Process Flow

Pre-treatment · membrane array · disinfection

A borehole at 1 850 mg/l TDS turned into drinking water at under 60 mg/l. Twelve process stages with instrumentation, target water quality, membrane data and a concentrate stream reused for irrigation instead of dumped to sewer.

WHO drinking-water guidelines KS EAS 12 Recovery 65 %
DWG TMEP-PH-DWG-121 REV P1 SCALE NTS @ A3

Drainage & Wastewater

Foul and surface water above and below ground, attenuation, and on-site treatment where there is no trunk sewer.

3 sheets
Drainage & Wastewater

Foul Sewer Layout & Sections

Soil & vent stack · manhole run · invert levels

A longitudinal section paired with the matching below-ground plan. Every manhole carries a cover and invert level, every run carries its fall — the detail a contractor actually needs to dig to.

BS EN 12056 (above ground) BS EN 752 (below ground) Falls 1:60 / 1:80
DWG TMEP-DR-DWG-201 REV P1 SCALE 1:50 @ A3
Drainage & Wastewater

Storm Water & Roof Drainage

Roof outlets · catchpits · attenuation & outfall

Roof plan and site plan on one sheet, sized on a 75 mm/h design storm. Falls, outlets, overflow weirs, catchpits with silt sumps and 36 m³ of attenuation limiting discharge to the greenfield rate the county will accept.

BS EN 12056-3 BS 8490 (siphonic) 1-in-50 year design event
DWG TMEP-DR-DWG-221 REV P1 SCALE 1:200 @ A3
Drainage & Wastewater

Sewage Treatment Plant

Process flow diagram & tank section

An extended-aeration package plant for 180 population equivalent — screening through to disinfection and reuse — with the tank section that shows the diffuser grid, sludge hopper and water levels a builder has to construct to.

NEMA Water Quality Regulations BOD₅ < 20 mg/l out Reuse for irrigation
DWG TMEP-DR-DWG-241 REV P2 SCALE NTS / 1:75 @ A3

HVAC & Ventilation

Ventilation, chilled water and refrigerant systems — drawn as coordinated systems, not as scattered symbols.

3 sheets
HVAC & Ventilation

HVAC Ventilation Layout

Ground floor · ductwork, diffusers and plant

Supply, return, extract and outside air drawn as four distinct systems, with an air-terminal schedule, volume-control and fire dampers at every compartment line, and design flow rates called up at each terminal.

DW/144 leakage class B CIBSE Guide A & B Velocity ≤ 5 m/s
DWG TMEP-ME-DWG-301 REV P3 SCALE 1:50 @ A3
HVAC & Ventilation

Chilled Water Plant Schematic

Chillers · low-loss header · variable-flow distribution

Two 450 kW chillers on N+1, constant-volume primary, variable secondary through two-port valves, and the ancillaries most schematics forget — pressurisation, expansion, dosing and air/dirt separation.

CIBSE Guide B2 BSRIA BG 29 pre-commission cleaning 6/12 °C · ΔT 6 K
DWG TMEP-ME-DWG-321 REV P2 SCALE NTS @ A3
HVAC & Ventilation

VRF Refrigerant & Indoor Unit Layout

Ground floor · branch tree, pipe sizes & condensate

Five indoor units on one branch tree with refnet joints, liquid and gas line sizes, condensate falls and traps — plus the pipe-run and level-difference checks that decide whether the system will actually perform.

EN 378 charge limits R-32 (A2L) refrigerant 41 bar nitrogen pressure test
DWG TMEP-ME-DWG-341 REV P1 SCALE 1:50 @ A3

Fire Protection

Coverage studies, wet risers, pump rooms, sprinklers, detection and alarm — proven hydraulically before issue.

2 sheets
Fire Protection

Fire Protection Layout

Hose-reel coverage · wet riser · detection & alarm

A coverage study, not a symbol drop. Hose-reel positions are proven with 6 m hose plus 6 m jet radii until every point of the floor is reachable, then backed by the wet riser, landing valve, detection and escape route.

BS EN 671-1 BS 9990 BS 5839-1 category L2
DWG TMEP-FF-DWG-401 REV P2 SCALE 1:50 @ A3
Fire Protection

Wet Riser & Fire Pump Schematic

Tank · duty / standby / jockey pumps · landing valves

The pump room and the riser it feeds, on one sheet. A dedicated 45 m³ tank, electric duty and diesel standby pumps at 1 800 l/min, a jockey pump, test line, landing valve at every floor, sprinkler control valve set and breeching inlet.

BS EN 12845 BS 9990 BS 9251
DWG TMEP-FF-DWG-421 REV P2 SCALE NTS @ A3

Electrical & Data

Final circuits, distribution, single-line diagrams and containment, with volt drop and discrimination verified.

2 sheets
Electrical & Data

Power, Lighting & Data Layout

Ground floor · final circuits and distribution

Small power, lighting and Cat6A data on one coordinated sheet, with distribution boards, an extract of the circuit schedule, segregated containment and the main earthing conductor shown explicitly.

IEC 60364 / BS 7671 Volt drop ≤ 3 % lighting, 5 % power CIBSE lighting guides
DWG TMEP-EL-DWG-501 REV P1 SCALE 1:50 @ A3
Electrical & Data

LV Single-Line Diagram

Main panel · generator & ATS · essential distribution

Utility transformer to final board on one page: an 800 A main busbar with nine outgoing ways, power factor correction, a 250 kVA generator on automatic changeover and a separately fed essential busbar — with the fire pump taken ahead of the main isolator.

IEC 60364 / BS 7671 BS 8519 (fire supplies) 25 kA fault level for 1 s
DWG TMEP-EL-DWG-521 REV P2 SCALE NTS @ A3

Renewable & Standby Power

Solar PV, storage, generators and changeover — engineered for the grid you actually have, not an ideal one.

1 sheet
Renewable & Standby Power

Solar PV & Standby Power Schematic

13.2 kWp array · hybrid inverter · battery & generator

A grid-tied hybrid system with 20 kWh of storage, sized to the daytime base load rather than to the roof area — with the DC protection, anti-islanding, export limiting and generator interlock that make it licensable and safe.

IEC 62109 / IEC 62116 EPRA net-metering rules IEC 61215 modules
DWG TMEP-EE-DWG-541 REV P1 SCALE NTS @ A3

Specialist Systems

Medical gases, LPG, pools and process systems — life-safety and hygiene-critical work with its own rulebook.

2 sheets
Specialist Systems

Medical Gas Pipeline Layout

Manifold room · risers · AVSUs · bed-head terminal units

Oxygen, nitrous oxide, medical air, vacuum and scavenging from manifold room to bed head — with duplex plant, compartmented risers, lockable area valve service units, area alarms and the terminal-unit arrangement at each bed.

HTM 02-01 ISO 7396-1 BS EN ISO 9170-1
DWG TMEP-SP-DWG-561 REV P2 SCALE NTS @ A3
Specialist Systems

Swimming Pool Plant Schematic

Balance tank · filtration · heating · disinfection

A 400 m³ deck-level pool on a four-hour turnover: balance tank, hair and lint strainer, duty/standby circulation, two sand filters at 25 m/h, plate heat exchanger, UV and dosing interlocked with proven flow.

PWTAG code of practice BS EN 16713 Free chlorine 1.0–3.0 mg/l
DWG TMEP-SP-DWG-581 REV P1 SCALE NTS @ A3

BIM Coordination

Federated models, clash-free sections and plant room layouts where every clearance is dimensioned.

2 sheets
BIM Coordination

BIM Services Coordination

Building section · riser shaft and ceiling-void zoning

The sheet that stops services fighting each other on site: a federated section showing the riser shaft, every discipline zoned through a 900 mm ceiling void, and an enlarged detail proving the clearances.

Autodesk Revit · Navisworks LOD 350 at construction issue Weekly clash matrix
DWG TMEP-BIM-DWG-601 REV C1 SCALE 1:100 @ A3
BIM Coordination

Plant Room Coordinated Layout

Plan & section · clearances and service zoning

Equipment footprints taken straight from the federated model, every maintenance clearance dashed and dimensioned — including the 3.2 m chiller tube-pull space that gets forgotten until the first tube change.

LOD 350 · clash-free at issue IEC 60364 panel clearances 2 400 mm minimum headroom
DWG TMEP-BIM-DWG-621 REV C1 SCALE 1:50 @ A3

Typical Details

The standard details a contractor is actually held to — supports, fire-stopping, sleeves and access.

1 sheet
Typical Details

Typical Installation Details

Supports · fire-stopping · chambers · access · isolation

Six standard details issued with every discipline package — pipe support and vibration isolation, fire-stopping at a penetration, inspection chamber section, AHU flexible connection, slab sleeve and pump inertia base.

Tested fire-stopping systems DW/143 duct leakage testing 25 mm static deflection mounts
DWG TMEP-STD-DWG-901 REV C2 SCALE AS NOTED @ A3

Issued With Every Package

A drawing is never issued on its own

Each discipline ships with the calculations and schedules that prove the drawing — the paperwork an approving authority, a main contractor and a facilities team all ask for.

Water & Plumbing

Cold & Hot Water Layout

  • Fixture & pipe-size schedule
  • Riser diagram
  • Valve schedule
Water & Plumbing

Water Storage, Booster & Riser Schematic

  • Pressure zone schedule
  • Storage & pump schedule
  • Static head calculation
Water & Plumbing

RO Water Treatment — Process Flow

  • Feed water analysis
  • Water quality targets
  • CIP & monitoring regime
Drainage & Wastewater

Foul Sewer Layout & Sections

  • Invert & cover level schedule
  • Manhole schedule
  • Air-test record sheet
Drainage & Wastewater

Storm Water & Roof Drainage

  • Rainfall & sizing calculation
  • Attenuation volume check
  • Discharge consent pack
Drainage & Wastewater

Sewage Treatment Plant

  • Process performance guarantee
  • Tank construction details
  • Sampling & monitoring plan
HVAC & Ventilation

HVAC Ventilation Layout

  • Air terminal schedule
  • Duct sizing calculations
  • Commissioning & balance sheet
HVAC & Ventilation

Chilled Water Plant Schematic

  • Valve & commissioning schedule
  • Pump duty selection
  • Water treatment regime
HVAC & Ventilation

VRF Refrigerant & Indoor Unit Layout

  • Indoor unit schedule
  • Pipe length & level check
  • Evacuation & charging record
Fire Protection

Fire Protection Layout

  • Hydraulic flow & pressure calculation
  • Coverage study
  • Device schedule
Fire Protection

Wet Riser & Fire Pump Schematic

  • Pump duty & hydraulic calculation
  • Weekly test regime
  • Fire log book format
Electrical & Data

Power, Lighting & Data Layout

  • Circuit schedules
  • Volt-drop calculations
  • Test & inspection certificates
Electrical & Data

LV Single-Line Diagram

  • Outgoing way schedule
  • Discrimination study
  • Short-circuit verification
Renewable & Standby Power

Solar PV & Standby Power Schematic

  • Energy yield model
  • String & protection schedule
  • Structural roof loading check
Specialist Systems

Medical Gas Pipeline Layout

  • Flow & diversity calculation
  • Test & purity certificates
  • Independent verification report
Specialist Systems

Swimming Pool Plant Schematic

  • Turnover & filtration calculation
  • Water quality regime
  • Plant schedule
BIM Coordination

BIM Services Coordination

  • Federated model
  • Clash report
  • As-built model at handover
BIM Coordination

Plant Room Coordinated Layout

  • Clearance schedule
  • Clash report & sign-off
  • Structural penetration drawings
Typical Details

Typical Installation Details

  • Detail library issued with drawings
  • Penetration register
  • Anti-vibration selection sheet

Your Project

Want this standard applied to your building?

Send an architectural plan and a brief. You’ll get back a scope, a fee and a drawing list — the exact sheets your project needs, in the order they are issued.