infodesk@techmepi.com +254 723 509 854 Utawala, Eastern Bypass, Nairobi, Kenya
Mon–Fri 8:00–17:00

D'Arros Island Development

Seychelles Hospitality 2024
Case Study

Project Overview

TechMEPi Engineering supervised specialized MEP engineering solutions across the D'Arros Island Development in Seychelles — one of the most demanding environments a building-services engineer can work in. Every system had to be designed for coastal salt-laden air, remote-island logistics and long-term reliability with limited access to spare parts.

Scope of work

  • Industrial HVAC systems — design supervision, installation and commissioning
  • Advanced air-conditioning installations across resort facilities
  • Heat-pump hot-water generation with buffer storage
  • Specialist wellness installations, including spa and cryotherapy facilities

Engineering for a remote coastal site

Remote-island projects amplify every design decision. Equipment selections prioritised corrosion resistance and serviceability; hydraulic layouts were validated before shipping; and commissioning was planned so systems could be proven with the resources available on the island.

The result is a set of building services engineered for optimal performance, energy efficiency and long-term reliability — delivered to international standards.